Our Projects
Plaza Gardenia
Palm Grove Villas
Palm Grove Heights
Pavilion Villas
Platinum Independent floors
The Residency
Platinum Greens

 
 
SPECIFICATIONS
 
Structure  
  Semi-load bearing walls and RCC structure
   
External Finish  
  Long-lasting paint/grit wash or equivalent
   
Wall Finish  
  Internal walls plastered and painted with pleasing shades of distemper
   
Flooring  
  Vitrified tiles in drawing, dinning and laminated wooden flooring/vitrified tiles in all bedrooms, ceramic tiles in kitchen, kota stone in balconies and verandah
   
Toilets  
Walls Dado upto 7'-0' height of glazed/ceramic tiles
Flooring Glazed/ceramic tiles
Fittings Wash basin, EWC, towel rail, hot and cold water system (without geyser)
 
Kitchen  
  Pre-polished granite, platform with stainless steel sink. Dado upto 2'-0' height of glazed tiles
   
Doors  
  Door frames of good quality hard wood, quality flush doors
   
Windows  
  Wooden windows/press steel windows
   
Electrification  
  Copper concealed wiring, provision for lights, plug points in all rooms, TV and telephone points in drawing room and all bedrooms

Note: Wooden almirahs in bedrooms.
 

 

Copyright © 2004 Ardee Infrastructure Pvt. Ltd. All Rights Reserved